Highway

Long Wait for Mumbai-Nagpur Expressway Is Over: Here’s When It Will Open to Traffic

The much-anticipated Mumbai-Nagpur Samruddhi Expressway is now on the brink of full completion. With the last 76-km stretch ready, Maharashtra is set to witness one of the biggest infrastructural transformations. This expressway will slash travel time between Mumbai and Nagpur from 16 hours to just 8 hours, revolutionizing connectivity and boosting economic growth across the state.

What is the Mumbai-Nagpur Samruddhi Expressway?

The Mumbai-Nagpur Expressway, officially known as the Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg, is a 701-km long highway connecting Mumbai with Nagpur. This state-of-the-art roadway will enhance connectivity for 14 districts in Maharashtra, providing seamless transit across the state.

Seamless Connectivity Across Maharashtra

Currently, commuters can travel from Igatpuri (near Nashik) to Nagpur, covering 625 km of the highway. With the completion of the last phase, the expressway will provide uninterrupted connectivity, benefiting thousands of daily travelers and commercial vehicles.

Which Districts Will the Expressway Connect?

The expressway will link 14 key districts, including:

  • Bhandara
  • Yavatmal
  • Gondia
  • Parbhani
  • Chandrapur
  • Akola
  • Raigad
  • Beed
  • Hingoli
  • Gadchiroli
  • Jalgaon
  • Dhule
  • Palghar
  • Nanded

This project ensures smoother transportation and economic growth in these regions.

Mumbai-Nagpur Expressway Route & Major Stops

The expressway will pass through key regions such as:

  • Bhiwandi
  • Kalyan
  • Shahapur
  • Igatpuri (Nashik)
  • Sinnar
  • Kopargaon
  • Shirdi
  • Aurangabad
  • Jalna
  • Mehkar
  • Karanja
  • Wardha
  • Seloo
  • MIHAN SEZ (Nagpur)

These major stops ensure efficient transportation for both passengers and freight, reducing traffic congestion on alternate routes.

Mumbai-Nagpur Expressway Toll Charges

According to reports, the expressway will have 26 toll booths, with the following estimated one-way toll charges:

  • Private Cars: ₹1,212
  • Commercial Vehicles: ₹1,955
  • Oversized Trucks: ₹7,830

These toll fees contribute to the maintenance and operation of the expressway.

Reduction in Travel Time & Enhanced Connectivity

Once operational, the expressway will significantly reduce travel time:

  • Mumbai to Nagpur: 16 hours → 8 hours
  • Mumbai to Navi Mumbai International Airport: 2 hours
  • Mumbai to Chhatrapati Shivaji Maharaj International Airport: 4.5 hours → 2.5 hours

This will streamline logistics, enhance trade, and ease passenger movement.

Boost to Trade & Economic Growth

The expressway will improve connectivity between Jawaharlal Nehru Port Trust (JNPT) in Mumbai and the upcoming Nagpur Multimodal International Airport. This is expected to boost trade, logistics, and industrial growth in Maharashtra.

Project Delays and Timeline Adjustments

The project was initially launched in phases:

  1. Phase 1: Nagpur to Shirdi (520 km) – Opened on December 11, 2022
  2. Phase 2: Shirdi to Bharvir (105 km) – Opened on May 23, 2023
  3. Phase 3: Bharvir to Igatpuri (25 km) – Opened on March 4, 2024
  4. Final Phase: Igatpuri to Amane (76 km) – Opening by mid-March 2025

Political transitions and construction delays led to minor setbacks, but the entire route is now set to be fully operational.

Safety and Security Features

The expressway includes advanced safety measures, such as:

  • Crash barriers
  • Emergency helpline numbers
  • CCTV surveillance
  • Speed monitoring systems
  • Medical aid centers

These ensure a safer journey for all commuters.

Why This Expressway Is a Game Changer

The Mumbai-Nagpur Expressway is not just a road; it is a symbol of progress. With reduced travel time, enhanced trade, and better connectivity, Maharashtra is poised for a massive infrastructural transformation. As the expressway opens in March 2025, it will be a landmark achievement in India’s highway network.

The wait is finally over! The Mumbai-Nagpur Samruddhi Expressway is set to open its final stretch in March 2025, reducing travel time and boosting economic development. This expressway marks a major leap forward for Maharashtra, paving the way for better trade, tourism, and transportation.

1. When will the Mumbai-Nagpur Expressway be fully operational?

The final phase will be completed and opened by mid-March 2025.

2. How much time will it take to travel from Mumbai to Nagpur on this expressway?

The travel time will be reduced from 16 hours to just 8 hours.

3. What are the toll charges for private cars on this expressway?

Private cars will be charged ₹1,212 for a one-way trip on the expressway.

4. Which major districts does the expressway pass through?

It passes through 14 key districts, including Nashik, Aurangabad, Jalna, and Wardha.

5. How will the expressway benefit Maharashtra’s economy?

It will enhance trade, logistics, tourism, and industrial development, making transportation more efficient and cost-effective.

Nagpur Updates

Nagpurupdates is your local/Digital news, entertainment, Events, foodies & tech website. We provide you with the happening news, Page3 Contain and all about Nagpur Foodies & Infrastructure from the Nagpur and world.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button

Adblock Detected

Disable Your Add Block To View Page.